College Hall Renovation

This project consists of a phased renovation of the University’s original building to facilitate centralizing the academic support services of: Admissions; Financial Aid; Advising; EOF; CADA; Adult Services Center; ASRP; Career Services; CoopEd; DRC; Registrar; Student Account Services; Enrollment Management; and the Office of the VP Student Development and Campus Life. Along with the aforementioned functional changes, this project will life cycle renovate this 105 year old building.

Phase One will be the construction of an addition on the first floor of the building.

Phase Two will complete the second and third floors of the addition and the renovation of the original building. The addition will be located on the northern side of the building, where the bridge exists today, and will be oriented towards the center of campus.

Within the addition on the first floor will be a new Utilities Infrastructure Vault that will house critical services such as steam, chilled water and electrical distribution systems, a telecommunications equipment room, and network operations center.

The second floor will be a two-story atrium and home to Red Hawk Central, the campus hub for all admissions and academic support services.

Live Construction Camera

View Full Screen