
The program calls for a 250-seat recital hall; teaching studios; music practice and rehearsal rooms; and faculty offices. Another goal of the project is to achieve a rating under the U.S. Green Building Council’s Leadership in Energy & Environmental Design (LEED) Sustainable Design Rating System.
To accommodate the program, the design proposes a new 23,000-square-foot, 2-story addition to the original 5-story, 29,000-square-foot structure, for a total of 52,000 square feet. The need for superior acoustics required the design team to overcome several challenges posed by the building’s existing tight floor-to-floor heights and older mechanical systems. Practice rooms and teaching studios are designed as a “box within a box” for acoustic isolation from other rooms. Innovative HVAC design accommodates the low floor-to-floor height (9’8”) of the existing building for superior soundproofing and optimal humidity and temperature control.
Exterior renovations to the building reorient the main entrance to face College Avenue, a major thoroughfare on campus, rather than the quadrangle, where the original entry was located. The new façade offers a picturesque interpretation of the original Spanish Mission Style and provides a formal gateway to the campus.
The Grand Opening of this facility is scheduled for early 2010.
Academic Support
Support Services
My Links