Shutdowns associated with steam piping systems affecting all of the campus buildings and dining services heat, steam and hot water excluding:
1. Student Recreation Center
2. Sinatra Hall
3. Hawks Crossing
4. The Village Complex
Shutdowns associated with steam piping systems affecting the air conditioning:
1. Kasser Theatre
2. Russ Hall
High Voltage Maintenance
May 25-26, 2013 - Primary Shutdown dates relative to High Voltage Maintenance are as follows:
Building Affected:
Campus Police
College Hall
Existing Co-Generation Plant
Maintenance Building
Red Hawk Deck
Science Hall
Bohn Hall
Student Center
University Hall
June 1-2, 2013- Alternate Shutdown Date