{"id":11071,"date":"2013-03-25T08:56:47","date_gmt":"2013-03-25T12:56:47","guid":{"rendered":"http:\/\/www.montclair.edu\/news\/article.php?ArticleID=11071"},"modified":"2018-05-08T10:39:22","modified_gmt":"2018-05-08T14:39:22","slug":"11071_construction-update-march-25-2013","status":"publish","type":"post","link":"https:\/\/www.montclair.edu\/facilities\/2013\/03\/25\/11071_construction-update-march-25-2013\/","title":{"rendered":"Construction Update \u2013 March 25, 2013"},"content":{"rendered":"<p>Construction is progressing at the new Combined Heating, Cooling and Power Plant (CHCP). Work is progressing on schedule for a plant start-up by the end of April. System flushing and testing is scheduled to begin on April 15.<\/p>\n<p><!--more--><\/p>\n<p>With the final sections of distribution piping being installed in the Alumni Green and behind the Student Center, backfill and restoration operations will begin in mid-April. Also during April, piping installation will continue behind Life Hall, in the road behind Morehead Hall and along Webster Road to the back of Blanton Hall.<\/p>\n<p>All excavation and piping installations are expected to be complete by the end of May.<\/p>\n<p>All roadways and pedestrian routes will be clearly marked so the campus community can navigate around construction areas easily. All buildings will remain open and accessible. Please see the campus <a href=\"http:\/\/www.montclair.edu\/facilities\/wp-content\/uploads\/sites\/57\/2017\/12\/Construction_Map_3-25-13.jpg\">construction map<\/a> for details of areas under construction and sidewalks that are open for use.<\/p>\n<p>For issues regarding the excavation and construction please contact Facility Maintenance and Engineering Services:<\/p>\n<ul>\n<li>Online at tma.montclair.edu<\/li>\n<li>Via email at <a href=\"mailto:servicedesk@mail.montclair.edu\">servicedesk@mail.montclair.edu<\/a><\/li>\n<li>Via phone at 973-655-5444 (Monday-Friday: 7:00 a.m. &#8211; 10:00 p.m. and Sunday 12:00 p.m. &#8211; 8:00 p.m.)<\/li>\n<li>Emergencies after hours or on weekends should be directed to University Police at 973-655-5222<\/li>\n<\/ul>\n<p>We will continue to issue updates on construction progress.<\/p>\n<p>Thank you for your continued cooperation and support with our effort to improve the University infrastructure.<\/p>\n<h2>Image Gallery<\/h2>\n<div class=\"prpl-photo-gallery\"><p class=\"a11y-label\">Click on an image below to enlarge photo.<\/p><div class=\"previous-button\"><a href=\"javascript: ;\">Previous<\/a><\/div><div class=\"next-button\"><a href=\"javascript: ;\">Next<\/a><\/div>\n<ul>\n<li><div class=\"gallery-item\"><div class=\"photo-holder\" style=\"background-image: url(\/responsive-media\/cache\/facilities\/wp-content\/uploads\/sites\/57\/2017\/12\/Construction_Map_3-25-13.jpg.0.1x.generic.jpg);\"><img decoding=\"async\" class=\"mlt-responsive-background\" data-original-image=\"\/facilities\/wp-content\/uploads\/sites\/57\/2017\/12\/Construction_Map_3-25-13.jpg\" src=\"\/responsive-media\/cache\/facilities\/wp-content\/uploads\/sites\/57\/2017\/12\/Construction_Map_3-25-13.jpg.0.1x.generic.jpg\" alt=\"Construction Map 3\/25\/13\"\/><\/div><div class='caption'><\/div><div class='close-button'><a href='javascript: ;'>Close<\/a><\/div><div class='open-button'><a href='javascript: ;'>Zoom In<\/a><\/div><\/div><\/li>\n<\/ul>\n<\/div><!-- cached result -->\n","protected":false},"excerpt":{"rendered":"<p>Construction is progressing at the new Combined Heating, Cooling and Power Plant (CHCP). Work is progressing on schedule for a plant start-up by the end of April. System flushing and testing is scheduled to begin on April 15.<\/p>\n","protected":false},"author":38,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[3,5],"tags":[],"class_list":["post-11071","post","type-post","status-publish","format-standard","hentry","category-238_chcp-updates","category-167_construction-news"],"_links":{"self":[{"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/posts\/11071","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/users\/38"}],"replies":[{"embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/comments?post=11071"}],"version-history":[{"count":1,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/posts\/11071\/revisions"}],"predecessor-version":[{"id":206242,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/posts\/11071\/revisions\/206242"}],"wp:attachment":[{"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/media?parent=11071"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/categories?post=11071"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/tags?post=11071"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}