{"id":207874,"date":"2020-02-28T16:23:44","date_gmt":"2020-02-28T21:23:44","guid":{"rendered":"http:\/\/www.montclair.edu\/facilities\/?p=207874"},"modified":"2024-08-05T09:39:54","modified_gmt":"2024-08-05T13:39:54","slug":"university-hall-elevators-are-so-bright-you-should-wear-shades","status":"publish","type":"post","link":"https:\/\/www.montclair.edu\/facilities\/2020\/02\/28\/university-hall-elevators-are-so-bright-you-should-wear-shades\/","title":{"rendered":"University Hall Elevators are so bright, you should wear shades."},"content":{"rendered":"<p>February 28, 2020<\/p>\n<p>University Facilities worked late into the evenings to spruce up University Hall&#8217;s elevators three, four and five entailing cleaning and polishing the interior of the cabs and interior and exterior doors.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.montclair.edu\/facilities\/wp-content\/uploads\/sites\/57\/2020\/02\/IMG_1479_elevatorBefore_horizontal-300x248.jpg\" alt=\"University Hall Elevators Dull finish\" width=\"300\" height=\"248\" \/>\u00a0<strong>before<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.montclair.edu\/facilities\/wp-content\/uploads\/sites\/57\/2020\/02\/IMG_4023-300x225.jpg\" alt=\"University Hall Elevator Doors\" width=\"300\" height=\"225\" \/>\u00a0<strong>after<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.montclair.edu\/facilities\/wp-content\/uploads\/sites\/57\/2020\/02\/IMG_4021-300x225.jpg\" alt=\"University Hall Elevators\" width=\"300\" height=\"225\" \/>\u00a0<strong>after<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>February 28, 2020 University Facilities worked late into the evenings to spruce up University Hall&#8217;s elevators three, four and five entailing cleaning and polishing the interior of the cabs and interior and exterior doors. \u00a0before \u00a0after \u00a0after<\/p>\n","protected":false},"author":170,"featured_media":210917,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[5,6],"tags":[],"class_list":["post-207874","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-167_construction-news","category-25_facilities"],"_links":{"self":[{"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/posts\/207874","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/users\/170"}],"replies":[{"embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/comments?post=207874"}],"version-history":[{"count":9,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/posts\/207874\/revisions"}],"predecessor-version":[{"id":210918,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/posts\/207874\/revisions\/210918"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/media\/210917"}],"wp:attachment":[{"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/media?parent=207874"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/categories?post=207874"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.montclair.edu\/facilities\/wp-json\/wp\/v2\/tags?post=207874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}