Hands typing on a laptop
Facilities News

Campus Road Work, November 16-28

Posted in: Construction News

With winter coming soon, workers will progress quickly to finalize the paving along W.Quarry.

November 15
Work will begin on Monday, November 15 along W.Quarry, on the east side of the road, from the area near the bottom of the near staircase up to the Yogi Berra Museum.  This work is to finalize curbing along this area and prepare for paving.

November 16 through 24
Curbing will continue along the roadway Tuesday, November 16 through Wednesday, November 24, with areas of sidewalk also being installed.

Also on Wednesday, November 24 a telecommunications manhole cover will be replaced near the south entrance to CarParc Diem within the roadway. University Police will be on hand to direct traffic as needed.

November 26, 27, and 28
Paving will take place on Friday, November 26 and Saturday, November 27 with striping to follow on Sunday, November 28, if needed.  The paving will take place along the entire W.Quarry Way from just south of CarParc Diem to an area just south of the Yogi Berra Museum.  Surface paving also will take place at the north entrance to CarParc Diem.

Our apologies for any inconvenience this may cause and, once again, thank you for your patience.